CAPITAL PROJECTS LIST
- Elementary Playgrounds – Allowance to upgrade Parkway owned building Elementary and Early Childhood Playgrounds. Two per site. One for age 2-5 and one for age 5-12.
- Flooring - Allowance for replacement of various floor coverings (i.e., carpet, carpet tile, vinyl tile and sheet, rubber tile and sheet, ceramic tile and poured resinous)
- Asphalt Sealing and Patching
- ADA Renovations - Allowance for various projects to improve accessibility
- Building Automation Upgrades – HVAC software and hardware upgrades for building temperature control
- Restroom Renovations - Allowance for refurbishments and renovations at various restrooms
- High School Locker Room Renovations
- SMART Board Refresh
- Disaster Recovery - Secondary internet connection with cold data center
- Redesign/burial of aerial fiber network
- Network upgrades - Switch refresh, Wireless, UPS, HVAC for data closets
- CCTV Camera Refresh
- South Area ECC Building combined with District TLA Offices
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $100,883,500
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof areas ROF-001, 006, 009, 014, 021, 012, 013, 018 and Cabin ROF-001
- Replace Pavement and Site Work Improvements - Replace parking lots & drives PAV-004 and SID-013
- Replace Exterior Doors: 3 Doors
- Replace Windows: 6 Windows
- Asbestos Floor Tile and Mastic Abatement
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $1,179,000
TOTAL ESTIMATED PROJECT COSTS - $1,179,000
-
CAPITAL PROJECTS LIST
- Install Building Fire Suppression System
- Replace Pavement and Site Work Improvements – Replace Parking Lots and Drives PAV-007 and 009, Exterior Ramps ERP-001 and 002, Exterior Stairs EST-002 and 005, sidewalks SID-001, 002, 004, 006, and 012
- Replace HVAC Equipment – Replace Rooftop HVAC Equipment RTG-001, 006, 007, and 008. Exhaust Fans EXF-006 and 008
- Replace Exterior Doors: 4 Doors
- Replace Windows: 7 Windows
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $4,452,000
REQUESTED PROJECTS LIST
- Renovations - Partition walls between small offices & classrooms to be replaced with drywall (1100 & 2100 Areas)
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $564,000
TOTAL ESTIMATED PROJECT COSTS - $5,016,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof areas ROF-001 through 010
- Replace Pavement and Site Work Improvements – Replace Parking Lots and Drives PAV-005, 007, 008. Exterior Ramps ERP-001. sidewalks SID-005, 006, 011, 012, 013, 017, 025
- Replace Exterior Doors: 10 Doors
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $3,745,000
REQUESTED PROJECTS LIST
- Concrete infill cafeteria for better ADA accessibility
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $170,000
TOTAL ESTIMATED PROJECT COSTS - $3,915,000
-
CAPITAL PROJECTS LIST
- Replace HVAC Equipment – Boilers HWB-001 through 004; Rooftop Units RTG-019 through 029
- Replace Domestic Water System Components – Pumps DWP-006 and 007
- Replace Roofs - Replace roof areas ROF-001, 015, 022, 028 through 034, and 043
- Pool Restoration
- Replace Gym A (RM255) Bleachers
- Replace Exterior Doors: 13 Doors
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $7,648,000
REQUESTED PROJECTS LIST
- Cafeteria Serving Area Renovation
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $2,761,000
TOTAL ESTIMATED PROJECT COSTS - $10,409,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof area ROF-004, through 006, and 014, through 020
- Replace Exterior Doors: 4 Doors
- Asbestos Abatements – Flooring
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $4,673,000
TOTAL ESTIMATED PROJECT COSTS - $4,673,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof areas ROF-001, 003, 004, 005, 006, 007, 012, and 013
- Replace HVAC Equipment – Boilers HWB-001 and 002, Hot Water Pumps 001 through 004
- Replace Electrical Switchboard – ESB-002
- Replace Pavement and Site Work Improvements - Replace parking lot and drive PAV-003; Replace exterior ramps ERP-002 & -003; Replace sidewalks SID-002 and 011
- Replace Exterior Doors: 12 Doors
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $3,822,000
TOTAL ESTIMATED PROJECT COSTS - $3,822,000
-
CAPITAL PROJECTS LIST
- Install Building Fire Suppression System
- Replace HVAC Equipment - Replace exhaust fans EXF-002 thru -005 & -007; Replace gas fired rooftop HVAC unit RTG-011
- Replace Roofs - Replace roof areas ROF-001, 005, 007, 009, 010, and 011
- Replace HVAC Equipment – Replace Rooftop HVAC Equipment RTG-001 through 012. Exhaust Fans EXF-001 through 007
- Replace interior lighting and ceilings
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-003 through 011; Replace concrete sidewalks SID-001, 011, 012, 013, 014, and 017
- Replace Storm Water Drain Line – STM-001
- Replace Exterior Aging Doors: 12 doors
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $10,190,000
TOTAL ESTIMATED PROJECT COSTS - $10,190,000
-
CAPITAL PROJECTS LIST
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-001 and 003; Replace concrete sidewalks SID-004, 007, 008, 011, 012, 014, 015; Replace ramps ERP-002 and 003
- Replace Windows: 32 Windows
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $1,026,000
REQUESTED PROJECTS LIST
- Renovations - Replace the accordion doors at ECC for new small therapy rooms & 2 small additional therapy rooms
- Replace retaining walls, add storm water surface drainage, and storm water retention basins
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $677,000
TOTAL ESTIMATED PROJECT COSTS - $1,703,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof areas ROF-001 through 007 and 009
- Replace Windows: 5 Windows
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $1,572,000
TOTAL ESTIMATED PROJECT COSTS - $1,572,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof areas ROF-005 and 006
- Replace Pavement and Site Work Improvements - Replace play area PAV-007; Replace concrete sidewalks SID-001, 002, 003, 012; and track surface TRK-001
- Replace Exterior Doors: 11 Doors
- Replace Windows: 3 Windows
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $998,800
TOTAL ESTIMATED PROJECT COSTS - $998,800
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof areas ROF-001, 002, 003, and 008
- Replace Pavement and Site Work Improvements - Replace pavement PAV-003 and 005; Replace stairs EST-002 and 010, Replace sidewalks SID-002, 007, 008, 009, an 011
- Replace Exterior Doors: 16 Doors
- Replace Windows: 12 Windows
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $2,771,000
REQUESTED PROJECTS LIST
- Parking Lot Renovation - Increase parking lot capacity and adjust traffic flow pattern
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $4,397,000
TOTAL ESTIMATED PROJECT COSTS - $7,168,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof areas ROF-006, 008, and 013
- Replace Pavement and Site Work Improvements - Replace pavement PAV-003 and 005; Replace stairs EST-002 and 010, Replace sidewalks SID-002, 007, 008, 009, and 011
- Replace Windows: 7 Windows
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $849,000
TOTAL ESTIMATED PROJECT COSTS - $849,000
-
CAPITAL PROJECTS LIST
- Complete Building Fire Suppression System
- Replace Roofs - Replace roof areas ROF-002 through 006, 008, and 009; Replace skylight RSH-002
- Replace Electrical Equipment - Replace main electrical switchboards ESB-001 & -002
- Replace HVAC Equipment – Replace Rooftop HVAC Equipment RTE-004 and 005
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-003 through 011; Replace concrete sidewalks SID-001, 011, 012, 013, 014, and 017
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
- Replace HVAC Equipment - Replace electric rooftop HVAC units RTE-004 & -005
- Replace Pavement and Site Work Improvements - Replace pavement PAV-003 through 005; Replace sidewalks SID-001, 002, 003, 004, 005, 006, and 011; Replace track surface TRK-001
- Replace Exterior Doors: 16 Doors
- Replace Windows: 11 Windows
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $4,752,000
REQUESTED PROJECTS LIST
- Concrete infill cafeteria for ADA
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $170,000
TOTAL ESTIMATED PROJECT COSTS - $4,922,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof area ROF-006
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-004 and 008; Replace concrete sidewalks SID-006, 007, 008, 010, and 011; Replace stairs EST-003 and 005; Replace track surface TRK-001
- Separate and replace both storm water and sanitary sewer line – STE-001 and SNE-001
- Replace Exterior Doors: 6 Doors
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $2,572,000
TOTAL ESTIMATED PROJECT COSTS - $2,572,000
-
MCKELVEY INTERMEDIATE
CAPITAL PROJECTS LIST
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-002 (with added drainage) and 003; Replace concrete sidewalks SID-001, 002, and 004
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $590,000
TOTAL ESTIMATED PROJECT COSTS - $590,000
-
CAPITAL PROJECTS LIST
- No Projects Funded
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $0
TOTAL ESTIMATED PROJECT COSTS - $0
-
CAPITAL PROJECTS LIST
- Complete Building Fire Suppression System
- Replace Electrical Switchboard – ESB-004
- Replace Roofs - Replace Stadium Press Box Roofing
- Pool Restoration
- Add/Replace Stadium Visitors Bleachers
- Caulk and Seal Building Aggregate Panels – EWF-001
- Replace Exterior Windows: 51 Windows
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $11,315,000
REQUESTED PROJECTS LIST
- Addition & Renovations - Continue master plan renovations for the building including an addition containing FACS and part of SSD; renovations of the existing FACS into main administrative and reception area; addition at the west courtyard for a new main entry to the building with secure entry vestibule and an elevator connecting the lower level drama area, the main floor, and the second floor; connect north and west parking lots
- Renovate North High’s Kitchen and Kitchen Flooring
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $19,620,000
TOTAL ESTIMATED PROJECT COSTS - $30,935,000
-
CAPITAL PROJECTS LIST
- Replace HVAC Equipment - Replace rooftop HVAC units RTC-002 through RTC-004, RTE-001, RTG-001 and 002
- Replace Pavement and Site Work Improvements -Replace asphalt parking lots & drives PAV-002, 005, 007, 008, 009, and 014
- Replace Roofs - Replace roof area ROF-002 through 005, 008, 009, 021, 022, 023, 025, 026, 027, and 028
- Replace Sanitary Waste Line – SNE-001
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $4,924,500
REQUESTED PROJECTS LIST
- Interior Renovations - Convert boy’s locker room to choir area
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $1,007,500
TOTAL ESTIMATED PROJECT COSTS - $5,932,000
-
OAK BROOK ELEMENTARY
CAPITAL PROJECTS LIST
- Replace Pavement and Site Work Improvements - Replace asphalt play area PAV-009; Replace sidewalks SID-005, 006, 011, 012, 014, 015, 020 through 027; Replace asphalt walking track TRK-001; Replace stairs EST-001
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $254,800
REQUESTED PROJECTS LIST
- Install an ADA compliant exterior sidewalk system around the building to connect fire exits
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $564,000
TOTAL ESTIMATED PROJECT COSTS - $818,800
-
CAPITAL PROJECTS LIST
- Install Building Fire Suppression System
- Replace HVAC Equipment - Replace gas fired rooftop RTG-001, 002, 004, 005, 006, 007, 008, 009, 013; Replace THD-001 and VAV-809, 812, 814, 815, 817, 819, C1GA, C1GB, C1GC, C1GD, AND C1GE
- Replace Domestic Water Components – Water Heaters DWH-001 and 002, and Pumps DWP-001 and 002
- Replace Roofs - Replace roof areas ROF-001 through 005 and 008
- Replace interior lighting and ceilings
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-001 through 004 and 006; Replace sidewalks SID-001, 006, and 022; Replace asphalt walking track TRK-001
- Replace Exterior Doors: 7 Doors
- Replace Windows: 5 Windows
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $7,347,000
TOTAL ESTIMATED PROJECT COSTS - $7,347,000
-
CAPITAL PROJECTS LIST
- Replace Domestic Water Components – Pump DWP-001
- Replace Roofs - Replace roof areas ROF-006, 007 and 012
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-001 and 005; Replace sidewalks SID-001, 006, 014, 015, and 017; Replace asphalt walking track TRK-001
- Replace Sanitary Waste Line – SNE-001
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $772,000
REQUESTED PROJECTS LIST
- Addition – Four Classrooms & a Storm Shelter
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $9,247,000
TOTAL ESTIMATED PROJECT COSTS - $10,019,000
-
CAPITAL PROJECTS LIST
- Replace HVAC Equipment – Boilers HWB-001 and 002; Hot Water Pumps HWP-001 through 004
- Replace Roofs - Replace roof areas ROF-002, 003, 004, 006, 008, 010, 011, 012, 013, and 014
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
- Replace Domestic Water Line – EWS-001
- Replace Sanitary Waste Line – SNE-001
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $3,305,000
TOTAL ESTIMATED PROJECT COSTS - $3,305,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof area ROF-016
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-005 and 006; Replace sidewalks SID-005 and 006; Replace Side Walks SID-007, 009, 012, and 013; Replace retaining walls RET-007 and 008
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $552,900
TOTAL ESTIMATED PROJECT COSTS - $552,900
-
CAPITAL PROJECTS LIST
- Replace HVAC Equipment – Air Handling Unit AHU-001; Air Cooled Chillers CHR-001 and 002; Chilled Water Pump CHP-001
- Replace Roofs - Replace roof area ROF-002
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-002; Replace Stairs EST-001; Replace Side Walks SID-001 through 004; Replace asphalt walking track TRK-001
- Replace Sanitary Waste Line – SNE-001
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $2,024,000
TOTAL ESTIMATED PROJECT COSTS - $2,024,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof areas ROF-005, 012, 015, 019, 020, 030, and 033
- Caulk and Seal Building Aggregate Panels – EWF-001 and 002
- Pool Restoration
- Replace Gym A Wood Floor
- Replace Exterior Doors: 7 Doors
- Replace Windows: 41 Windows
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $7,306,000
TOTAL ESTIMATED PROJECT COSTS - $7,306,000
-
CAPITAL PROJECTS LIST
- Install Building Fire Suppression System
- Replace Domestic Water System Components – Water Heater DWH-001
- Replace Pavement and Site Work Improvements –Replace Side Walks SID-006 and 007
- Replace Roofs - Replace roof area ROF-004, 006, 008, 009, 012, 013, and 015; Replace Skylight RSH-001
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $13,045,000
REQUESTED PROJECTS LIST
- New Parking Lot on west side of campus
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $1,200,000
TOTAL ESTIMATED PROJECT COSTS - $14,245,000
-
CAPITAL PROJECTS LIST
- Replace Pavement and Sitework Improvements - Replace parking lots & drives PAV-002, 003, and 007; Replace exterior ramps ERP-001 and 003; Replace Sidewalks SID-002 through 011
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $988,000
TOTAL ESTIMATED PROJECT COSTS - $988,000
-
CAPITAL PROJECTS LIST
- Replace HVAC Equipment - Replace gas fired rooftop HVAC unit RTG-005
- Replace Roofs - ROF-06, 012, 013, 014, 016, 018, 019, 021, 023, 027, 028, and 029
- Pool Restoration
- Replace Elevators – ELE-001 and 002
- Replace Gym A Wood Floor
- Replace Gym B Bleachers
- Replace Exterior Doors: 3 Doors
- Replace Windows: 4 Windows
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $5,593,000
REQUESTED PROJECTS LIST
- Add Exterior Drainage and Retraining Walls along baseball and soccer fields
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $1,354,000
TOTAL ESTIMATED PROJECT COSTS - $6,947,000
-
CAPITAL PROJECTS LIST
- Install Building Fire Suppression System
- Replace HVAC Equipment – Roof Mounted HVAC Duct Work on ROF-005, 007, 010, and 013
- Replace Roofs - Replace roof areas ROF-005 through 008. 010, 012 through 014, 017, 018, and 021 through 023
- Replace Athletic Flooring and Bleachers – Gym A (RM1400)
- Asbestos Abatements – Flooring, Ceiling, and Wallboards
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $7,416,000
TOTAL ESTIMATED PROJECT COSTS - $7,416,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - Replace roof area ROF-001, 002, 004, 007, 008, 013, 014, 015, and 016; Replace Sky Lights RSH 001 through 003
- Replace Pavement and Site Work Improvements - Replace parking lots and drives PAV-006 and 007; Replace Side Walks SID-001, 004, 006, 024, 033, 035, 036, 037, 039, 040, 041, and 044
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $1.938,000
REQUESTED PROJECTS LIST
- Exterior Renovations - Re-design the front sidewalk to make it more ADA accessible
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $564,000
TOTAL ESTIMATED PROJECT COSTS - $2,502,000
-
CAPITAL PROJECTS LIST
- Replace Pavement and Site Work Improvements - Replace parking lot & drives PAV-002 & -003; Replace concrete sidewalks SID-001 and 004
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $841,000
TOTAL ESTIMATED PROJECT COSTS - $841,000
-
CAPITAL PROJECTS LIST
- Replace Pavement and Site Work Improvements - Replace parking lots & drives PAV-003, 004, and 011
- Replace Exterior Doors: 3 Doors
- Replace Windows: 4 Windows
- Asbestos Abatements – Flooring
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $2,214,000
REQUESTED PROJECTS LIST
- Add a New District Long Term Storage Building
SUBTOTAL ESTIMATED REQUESTED PROJECTS COSTS - $395,000
TOTAL ESTIMATED PROJECT COSTS - $2,609,000
-
CAPITAL PROJECTS LIST
- Renovate Grounds and Storage Building
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $241,000
TOTAL ESTIMATED PROJECT COSTS - $241,000
-
CAPITAL PROJECTS LIST
- Replace Roofs - ROF-001 (with side window walls)
- Asbestos Abatements – Walls
SUBTOTAL ESTIMATED CAPITAL PROJECTS COSTS - $509,000